The page you're viewing is for Korean (Korea) region.

제품군

Spare Parts Kits for Industrial Sites

Make sure you have the parts on hand for every situation. Your industrial power protection system is designed to operate for 20+ years, but it will need timely parts replacements to function properly. Contact us for recommendations on spare parts kits according to the system age and application environment.

적합한 용도:
  • ChemicalPetrochemical excl. Oil Gas
  • Manufacturing
  • MiningMetals
  • Nuclear Power
  • Oil and Gas
  • Power Generation
  • PowerGas Transmission and Distribution
  • Transportation
  • Water SupplySewage Disposal
  • Marine

복지

Spare part kits designed for the speed of replacement on site.
Minimizes any unplanned downtime in case of urgent repair or component replacement.
Scheduled replacement of high-wear components guarantee uncompromised reliability throughout the UPS design life.

특징

Pre-configured part kits according to system age.
Control boards are set up and tested for "plug and play" functionality.
Available through annual subscription contracts to ensure short replenishment time.

지역 연락처 찾기

제품 지원 연락처

연락처 보기 Ohio, 43215, USA 변경
[QA] Test Office Name Seven
555-555-1240
Test Office Location Seven Alabama 35213 USA
서비스 중점 영역: 비상 대응, 예비 부품 및 부품 관리
Abacus Test Office
Abacus Test Office Address Louisiana 70033 USA
서비스 중점 영역: 프로젝트 서비스, 성능 최적화 서비스, 교육, 비상 대응, 예방 보수, 산업용 애플리케이션을 위한 예방 유지 보수, 원격 서비스, 예비 부품 및 부품 관리, Generators & Switchgear Services
Beetle Test Office
Beetle Test Office Address Louisiana 70033 USA
서비스 중점 영역: 프로젝트 서비스, 성능 최적화 서비스, 교육, 비상 대응, 예방 보수, 산업용 애플리케이션을 위한 예방 유지 보수, 원격 서비스, 예비 부품 및 부품 관리, Generators & Switchgear Services

자주 묻는 질문

Q
What is the best way to manage the spare parts for industrial UPS system?
A
The most reliable way to ensure that you always have necessary parts ready for replacement is to subscribe to the annual spare parts management contract which will assure that you have the right parts for your system and used parts are replenished quickly.

언어 & 지역